Results for spec/EXT_transform_feedback/max-varyings

Overview

Status: fail
Result: fail

Back to summary

Details

Detail Value
returncode 1
time 2.11614894867
note
Returncode was 1
command
/Users/vlee/workspace/piglit/framework/../bin/ext_transform_feedback-max-varyings -auto -fbo
info
Returncode: 1

Errors:


Output:
Vertical axis: Increasing numbers of varyings captured by transform feedback.
Horizontal axis: Offset of first varying captured.
GL_MAX_VARYING_FLOATS = 128
GL_MAX_TRANSFORM_FEEDBACK_INTERLEAVED_COMPONENTS = 64
When recording 1 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 0
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 0
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 4, varying 0
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 5, varying 0
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 14
Got incorrect transform feedback data for vertex 4, varying 0
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 14
Got incorrect transform feedback data for vertex 5, varying 0
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 15
Got incorrect transform feedback data for vertex 4, varying 0
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 1 varyings
Out of a total of 16
With an offset of 15
Got incorrect transform feedback data for vertex 5, varying 0
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 1
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 1
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 0
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 1
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 0
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 1
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 4, varying 0
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 4, varying 1
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 5, varying 0
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 5, varying 1
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 14
Got incorrect transform feedback data for vertex 4, varying 0
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 14
Got incorrect transform feedback data for vertex 4, varying 1
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 14
Got incorrect transform feedback data for vertex 5, varying 0
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 2 varyings
Out of a total of 16
With an offset of 14
Got incorrect transform feedback data for vertex 5, varying 1
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 2
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 2
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 1
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 2
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 1
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 2
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 0
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 1
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 2
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 0
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 1
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 2
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 4, varying 0
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 4, varying 1
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 4, varying 2
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 5, varying 0
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 5, varying 1
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 3 varyings
Out of a total of 16
With an offset of 13
Got incorrect transform feedback data for vertex 5, varying 2
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 3
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 3
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 2
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 3
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 2
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 3
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 1
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 2
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 3
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 1
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 2
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 3
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 0
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 1
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 2
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 4, varying 3
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 0
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 1
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 2
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 4 varyings
Out of a total of 16
With an offset of 12
Got incorrect transform feedback data for vertex 5, varying 3
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 4
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 4
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 3
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 4
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 3
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 4
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 2
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 3
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 4
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 2
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 3
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 4
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 1
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 2
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 3
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 4, varying 4
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 0
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 1
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 2
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 3
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 5 varyings
Out of a total of 16
With an offset of 11
Got incorrect transform feedback data for vertex 5, varying 4
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 5
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 5
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 4
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 5
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 4
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 5
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 3
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 4
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 5
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 3
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 4
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 5
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 2
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 3
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 4
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 4, varying 5
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 0
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 1
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 2
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 3
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 4
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 6 varyings
Out of a total of 16
With an offset of 10
Got incorrect transform feedback data for vertex 5, varying 5
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 6
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 6
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 5
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 6
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 5
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 6
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 4
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 5
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 6
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 4
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 5
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 6
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 3
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 4
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 5
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 4, varying 6
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 0
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 1
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 2
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 3
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 4
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 5
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 7 varyings
Out of a total of 16
With an offset of 9
Got incorrect transform feedback data for vertex 5, varying 6
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 7
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 7
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 6
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 7
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 6
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 7
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 5
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 6
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 7
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 5
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 6
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 7
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 4
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 5
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 6
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 4, varying 7
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 0
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 1
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 2
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 3
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 4
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 5
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 6
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 8 varyings
Out of a total of 16
With an offset of 8
Got incorrect transform feedback data for vertex 5, varying 7
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 8
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 8
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 7
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 8
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 7
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 8
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 6
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 7
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 8
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 6
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 7
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 8
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 5
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 6
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 7
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 4, varying 8
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 0
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 1
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 2
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 3
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 4
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 5
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 6
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 7
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 9 varyings
Out of a total of 16
With an offset of 7
Got incorrect transform feedback data for vertex 5, varying 8
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 9
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 9
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 8
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 9
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 8
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 9
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 7
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 8
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 9
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 7
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 8
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 9
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 6
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 7
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 8
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 4, varying 9
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 0
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 1
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 2
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 3
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 4
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 5
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 6
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 7
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 8
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 10 varyings
Out of a total of 16
With an offset of 6
Got incorrect transform feedback data for vertex 5, varying 9
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 10
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 10
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 9
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 10
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 9
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 10
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 8
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 9
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 10
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 8
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 9
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 10
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 7
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 8
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 9
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 4, varying 10
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 0
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 1
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 2
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 3
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 4
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 5
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 6
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 7
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 8
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 9
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 11 varyings
Out of a total of 16
With an offset of 5
Got incorrect transform feedback data for vertex 5, varying 10
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 11
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 11
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 10
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 11
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 10
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 11
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 9
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 10
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 11
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 9
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 10
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 11
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 8
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 9
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 10
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 4, varying 11
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 0
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 1
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 2
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 3
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 4
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 5
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 6
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 7
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 8
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 9
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 10
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 12 varyings
Out of a total of 16
With an offset of 4
Got incorrect transform feedback data for vertex 5, varying 11
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 12
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 12
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 11
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 12
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 11
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 12
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 10
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 11
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 12
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 10
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 11
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 12
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 9
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 10
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 11
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 4, varying 12
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 0
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 1
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 2
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 3
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 4
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 5
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 6
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 7
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 8
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 9
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 10
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 11
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 13 varyings
Out of a total of 16
With an offset of 3
Got incorrect transform feedback data for vertex 5, varying 12
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 12
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 13
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 12
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 13
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 11
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 12
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 13
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 11
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 12
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 13
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 10
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 11
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 12
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 4, varying 13
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 0
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 1
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 2
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 3
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 4
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 5
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 6
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 7
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 8
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 9
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 10
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 11
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 12
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 14 varyings
Out of a total of 16
With an offset of 2
Got incorrect transform feedback data for vertex 5, varying 13
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 12
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 13
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 14
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 12
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 13
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 14
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 11
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 12
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 13
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 4, varying 14
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 0
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 1
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 2
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 3
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 4
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 5
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 6
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 7
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 8
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 9
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 10
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 11
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 12
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 13
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 15 varyings
Out of a total of 16
With an offset of 1
Got incorrect transform feedback data for vertex 5, varying 14
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 12
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 13
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 14
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 4, varying 15
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 0
Expected (0.000000, 1.000000, 2.000000, 3.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 1
Expected (4.000000, 5.000000, 6.000000, 7.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 2
Expected (8.000000, 9.000000, 10.000000, 11.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 3
Expected (12.000000, 13.000000, 14.000000, 15.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 4
Expected (16.000000, 17.000000, 18.000000, 19.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 5
Expected (20.000000, 21.000000, 22.000000, 23.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 6
Expected (24.000000, 25.000000, 26.000000, 27.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 7
Expected (28.000000, 29.000000, 30.000000, 31.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 8
Expected (32.000000, 33.000000, 34.000000, 35.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 9
Expected (36.000000, 37.000000, 38.000000, 39.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 10
Expected (40.000000, 41.000000, 42.000000, 43.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 11
Expected (44.000000, 45.000000, 46.000000, 47.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 12
Expected (48.000000, 49.000000, 50.000000, 51.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 13
Expected (52.000000, 53.000000, 54.000000, 55.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 14
Expected (56.000000, 57.000000, 58.000000, 59.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
When recording 16 varyings
Out of a total of 16
With an offset of 0
Got incorrect transform feedback data for vertex 5, varying 15
Expected (60.000000, 61.000000, 62.000000, 63.000000)
Actual (0.000000, 0.000000, 0.000000, 0.000000)
Probe at (194,2)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 1 vec4 varyings captured and offset 16
Probe at (182,14)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 2 vec4 varyings captured and offset 15
Probe at (170,26)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 3 vec4 varyings captured and offset 14
Probe at (158,38)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 4 vec4 varyings captured and offset 13
Probe at (146,50)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 5 vec4 varyings captured and offset 12
Probe at (134,62)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 6 vec4 varyings captured and offset 11
Probe at (122,74)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 7 vec4 varyings captured and offset 10
Probe at (110,86)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 8 vec4 varyings captured and offset 9
Probe at (98,98)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 9 vec4 varyings captured and offset 8
Probe at (86,110)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 10 vec4 varyings captured and offset 7
Probe at (74,122)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 11 vec4 varyings captured and offset 6
Probe at (62,134)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 12 vec4 varyings captured and offset 5
Probe at (50,146)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 13 vec4 varyings captured and offset 4
Probe at (38,158)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 14 vec4 varyings captured and offset 3
Probe at (26,170)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 15 vec4 varyings captured and offset 2
Probe at (14,182)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 16 vec4 varyings captured and offset 1
Probe at (2,194)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 17 vec4 varyings captured and offset 0
Probe at (2,206)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 18 vec4 varyings captured and offset 0
Probe at (2,218)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 19 vec4 varyings captured and offset 0
Probe at (2,230)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 20 vec4 varyings captured and offset 0
Probe at (2,242)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 21 vec4 varyings captured and offset 0
Probe at (2,254)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 22 vec4 varyings captured and offset 0
Probe at (2,266)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 23 vec4 varyings captured and offset 0
Probe at (2,278)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 24 vec4 varyings captured and offset 0
Probe at (2,290)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 25 vec4 varyings captured and offset 0
Probe at (2,302)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 26 vec4 varyings captured and offset 0
Probe at (2,314)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 27 vec4 varyings captured and offset 0
Probe at (2,326)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 28 vec4 varyings captured and offset 0
Probe at (2,338)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 29 vec4 varyings captured and offset 0
Probe at (2,350)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 30 vec4 varyings captured and offset 0
Probe at (2,362)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 31 vec4 varyings captured and offset 0
Probe at (2,374)
  Expected: 0.000000 1.000000 0.000000
  Observed: 0.498039 0.498039 0.498039
  Failure with 32 vec4 varyings captured and offset 0

Back to summary